Home
Planning and Materials
Cost
Hot Wire Foam Cutter
Cutting the foam
Refining the shape
Applying the epoxy filler
Springboard tunnel
Hard points and reinforcements
  Seatbelt attach point
Plank rope assembly attach point
Mast base attach point
Sheave attach point
Applying Fiberglass
 

Bottom
Top
Filler and Fairing

Hardware
Plank Attach Plates
Pedals System
 

Pedal Slots
Steering Linkage
Pedal Parts
Finished Pedal Assembly

Front Springboard
Rear Plank
Runners
Paint
Final Assembly
Photo Gallery
Impressions


Hardware
Started making all of my metal parts and picking up all of the different stainless fasteners to hold it on. Also purchased all of my Harken hardware.






You can see the rear plank attach bars (more detail here), sheave plate and mast helper plate along with the Harken gear.


Mast helper plate and 57mm Harken Rachematic Carbo Air Block.


Sheave plate and Harken 19mm Carbo blocks.


Sheave plate and Harken 19mm Carbo blocks.


Front springboard attach plates. My idea for a pedal system. (more on that here)






 

 

Google